Δημόσιες Διαβουλεύσεις ENTSO-E, σε εξέλιξη

Δημόσιες Διαβουλεύσεις ENTSO-E, σε εξέλιξη
Σας ενημερώνουμε ότι στην ιστοσελίδα του ENTSO-E https://www.entsoe.eu/resources/consultations/   έχουν αναρτηθεί και είναι υπό δημόσια διαβούλευση  τα κείμενα του πίνακα που ακολουθεί

Document title

Consultation period

Current status

 

2012

 

TYNDP 2012 Package – TYNDP 2012 report

1 Mar – 26 Apr 2012

Open Consultation

The Ten Year Network Development plan, here under consultation, synthetic overview at pan-European level of the drivers, bottlenecks and transmission infrastructure in the next 10 years.

TYNDP 2012 Package – RegIP Baltic Sea

1 Mar – 26 Apr 2012

Open Consultation

This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Baltic Sea region.

TYNDP 2012 Package – RegIP Continental South East

1 Mar – 26 Apr 2012

Open Consultation

This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Continental South East region

TYNDP 2012 Package – RegIP Continental Central East

1 Mar – 26 Apr 2012

Open Consultation

This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Continental Central East region

TYNDP 2012 Package – RegIP Continental South West

1 Mar – 26 Apr 2012

Open Consultation

This report gives the overview of the drivers, bottlenecks and the grid development in the South West region.

TYNDP 2012 Package – RegIP Continental Central South

1 Mar – 26 Apr 2012

Open Consultation

This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Continental Central South region

TYNDP 2012 Package – RegIP North Sea

1 Mar – 26 Apr 2012

Open Consultation

This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the North Sea region.

TYNDP 2012 Package – Scenario Outlook & Adequacy Forecast

1 Mar – 26 Apr 2012

Open Consultation

ENTSO-E’s SO&AF 2012- 2030 assesses the future system adequacy at a mid-to long-term time horizon. The report analyses the adequacy of the ENTSO-E power system by providing an overview of generation adequacy analyses for all of ENTSO-E, its regions as well as for individual countries, including an assessment of the role of the transmission capacities and security of supply on a regional basis.

Network Code for Requirements for Grid Connection applicable to all Generators

24 Jan – 20 Mar 2012

Open Consultation

Network Code for Requirements for Grid Connection applicable to all Generators