| Document title | Consultation period | Current status |
|
| 2012 |
| ||
| TYNDP 2012 Package – TYNDP 2012 report | 1 Mar – 26 Apr 2012 | Open Consultation | The Ten Year Network Development plan, here under consultation, synthetic overview at pan-European level of the drivers, bottlenecks and transmission infrastructure in the next 10 years. |
| TYNDP 2012 Package – RegIP Baltic Sea | 1 Mar – 26 Apr 2012 | Open Consultation | This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Baltic Sea region. |
| TYNDP 2012 Package – RegIP Continental South East | 1 Mar – 26 Apr 2012 | Open Consultation | This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Continental South East region |
| TYNDP 2012 Package – RegIP Continental Central East | 1 Mar – 26 Apr 2012 | Open Consultation | This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Continental Central East region |
| TYNDP 2012 Package – RegIP Continental South West | 1 Mar – 26 Apr 2012 | Open Consultation | This report gives the overview of the drivers, bottlenecks and the grid development in the South West region. |
| TYNDP 2012 Package – RegIP Continental Central South | 1 Mar – 26 Apr 2012 | Open Consultation | This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the Continental Central South region |
| TYNDP 2012 Package – RegIP North Sea | 1 Mar – 26 Apr 2012 | Open Consultation | This report gives the overview of the drivers, bottlenecks and the grid development for the next 10 years in the North Sea region. |
| TYNDP 2012 Package – Scenario Outlook & Adequacy Forecast | 1 Mar – 26 Apr 2012 | Open Consultation | ENTSO-E’s SO&AF 2012- 2030 assesses the future system adequacy at a mid-to long-term time horizon. The report analyses the adequacy of the ENTSO-E power system by providing an overview of generation adequacy analyses for all of ENTSO-E, its regions as well as for individual countries, including an assessment of the role of the transmission capacities and security of supply on a regional basis. |
| Network Code for Requirements for Grid Connection applicable to all Generators | 24 Jan – 20 Mar 2012 | Open Consultation | Network Code for Requirements for Grid Connection applicable to all Generators
|
Current ENTSO-E Public Consultations