The project concerns the construction of a 400 kV Overhead Transmission Line which connects the EHV S/S of LAGADA to the EHV S/S of FILIPPI. The length of the Transmission Line is approximately 110km.
The project enhances the power transfer capacity and the reliability of the 400kV System in East Macedonia and Thrace contributing to the development of Renewable Energy Sources, by allowing the absorption of significant wind power production in the region, the provision of access to the Transmission System for the new Thermal Power Stations in the Thrace area and the reinforcement of interconnections with neighboring countries.