System Studies

Adequacy of electricity capacity and adequate capacity reserve margins

According to the provisions of Law 4001/2011 and the Grid Code, the HETS Operator is carrying out a special study relating to the adequacy of electrical capacity and adequate capacity reserve margins, taking into consideration each time the approved Ten-year Network Development Plan of the HETS, and the country's long-term energy planning.

Also, in the framework of planning the HETS development projects, special network analysis studies are being carried out, as well as studies for the operation of HETS on a short-term and long-term horizon.