RTBM
Real‐Time Balancing Market
Due to unexpected unavailability of production units, works on the OHL 400kV HVSS MEGALOPOLI (843, 823) – HVSS ACHELLOOS (833) - HVSS DISTOMO (863), scheduled from Saturday 29/08/2026 08:00 ΕΕΤ to Sunday 06/09/2026 16:00 ΕΕΤ with previous announcement, are suspended.
Following the warning published on IPTO’s website on 30.05.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-5) and based on updated estimation, the need for increased readiness for the total limitation of the power production of the R
Based on IPTO's estimation for June 1, 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be requi
Following the warning published on IPTO’s website on 15.05.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-4
Following the warning published on IPTO’s website on 15.05.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-4
Based on IPTO's estimation for 17 and 18 May 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above period.