RTBM

Real‐Time Balancing Market

Due to unexpected unavailability of production units, works on the OHL 400kV HVSS MEGALOPOLI (843, 823) – HVSS ACHELLOOS (833) - HVSS DISTOMO (863), scheduled from Saturday 29/08/2026 08:00 ΕΕΤ to Sunday 06/09/2026 16:00 ΕΕΤ with previous announcement, are suspended.

 

Based on IPTO's estimation for June 1, 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be requi

Based on IPTO's estimation for 17 and 18 May 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above period.