ON SHORE

Based on IPTO's estimation for the period from 28 April to 01 May 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above period.

The estimated time of the total limitation is expected to be within the following hours: 

Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2) and based on updated estimation, the need for increased readiness for the total limitation of the power production of the RES and COGEN stations in th

Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2) regarding the need for increased readiness for the total limitation of the power production of the RES and COGEN stations in the Distribution Network

Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2) regarding the need for increased readiness for the total limitation of the power production of the RES and COGEN stations in the Distribution Network