ON SHORE

Based on IPTO's estimation for June 1, 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be requi

Based on IPTO's estimation for 17 and 18 May 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above period.