RES

Renewable Energy Sources

Based on IPTO's estimation for April 13, 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above date. 

Based on IPTO's estimation for April 06, 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above date. 

The estimated time of the total limitation is expected to be within the following hours: