Transmission System Operation & Control Department
Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2
Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2) and based on updated estimation, the need for increased readiness for the total limitation of the power production of the RES and COGEN stations in th
Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2) regarding the need for increased readiness for the total limitation of the power production of the RES and COGEN stations in the Distribution Network
Following the warning published on IPTO’s website on 16.04.2025 (https://www.admie.gr/anakoinoseis/enimerosi/proeidopoiisi-gia-paramoni-se-etoimotita-gia-ton-pliri-periorismo-ishyos-2) regarding the need for increased readiness for the total limitation of the power production of the RES and COGEN stations in the Distribution Network
We inform you that following the justified request of the producer PPC S.A., the Units Maintenance Schedule 2025 is updated. The updated (version 6) Units Maintenance Schedule is here.
Based on IPTO's estimation for the Easter period from 18 to 21 April 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above period.
The estimated time of the total limitation is expected to be required daily from Good Friday until Easter Monday within the following hours: