Producer

We inform you that, following the justified request of producer METLEN S.A., the annual maintenance of AG. NIKOLAOS II is extended till 18/5/2025.

Based on IPTO's estimation for the period from 02 May to 04 May 2025, a total limitation of the power production of the RES and COGEN stations in the Distribution Network, belonging to Group B, may be required during the above period.

The estimated time of the total limitation is expected to be within the following hours: