• Interconnecting the future

    With reliability

  • Interconnecting the future

    With economic benefits for all

  • Interconnecting the future

    With respect for the environment and local communities

15.11.2023
Speech by the Chairman and CEO of IPTO at the Annual General Assembly of Med-TSO
06.10.2023
Strategic agreement between IPTO and EuroAsia Interconnector
06.11.2023
Regarding the joint commercial exploitation of the optical fiber links installed on Greece - Bulgaria 400 kV interconnectors

System Load

Daily Production per Fuel & Interconnections Balance

Transmission System

The dynamic map depicts the 400 KV transmission lines and Greece's interconnections with the islands and with foreign countries  Italy, Albania, Northern Macedonia, Bulgaria and Turkey.

The flows of foreign interconnections concern 08/07/2020 12:00 EEST.
 

Lines by voltage level (colors)

 
380 - 400 kV transmission line
 
132 - 150 kV transmission line
 
Direct Current line

 

Additional data for all lines and trends

 
Under construction

 

Created with Highcharts 8.0.4 0 0 0 0 0 Highcharts.com © Natural Earth Copyright (c) 2020 Highsoft AS, Based on data from Natural Earth
IPTO at a glance
5
billion euros of investments till 2030
27
Extra High Voltage Centers (EHV S/S)
348
Substations
2000
Employees
1500
km submarine and underground cables
12000
km overhead (OHL) lines