Disconnection of 400 KV DC link between Greece and Italy

03.01.2013

Following reassessment of the failure caused by the oil leakage to the High Voltage DC Link at Italy’s side (Galatina), it is estimated that the 400 KV DC link between Greece and Italy will remain disconnected until 16:00 CET of 11-01-2013. During this disconnection the NTC values will be set to zero, in both directions (NTC=0).

In case the duration of the 400 KV DC link disconnection is altered further announcement will follow.